25
Oct
Over the next several weeks, the Port of Bellingham will be fixing three shoreline areas that were ravaged by a massive storm. Some of the repair will be happening at night during low tide. The work includes “armor rock removal and stockpiling, rubble removal, and rock re-placement along the identified shoreline areas, with some limited asphalt repairs at the Squalicum and Fairhaven locations,” according to the port. Repairs are scheduled to take place from Oct. 22 to Nov. 4 at the Squalicum Location, Nov. 5–14 at the Hilton location, and Nov. 15–30 at the Fairhaven location.